Back to blog

Rwanda’s New EV Charging Rules Are Here. Is Your Network Ready?

Cover of RURA Regulations Nº 011/ENERGY/RURA/2026 governing electric vehicle charging infrastructure and battery swapping stations

RURA’s latest EV charging regulations make one thing clear: a charger is no longer just hardware connected to electricity.

It is a regulated, monitored, customer-facing service.

For CPOs, the question is no longer simply, “Can we install chargers?”

It is: Can we operate them reliably, manage them intelligently, and prove compliance?

That is where Pulse comes in.

RURA now expects smart charging

Public charging stations and charging battery-swapping stations must support:

Pulse helps operators monitor, manage, and optimise their charging network from one digital operating layer.

97% uptime is not optional

RURA requires a minimum charger uptime of 97%, with repairs completed within 24 hours.

Service incidents must be reported quickly: an initial report within one hour, followed by a detailed report within 48 hours when downtime exceeds one hour.

Without real-time operational visibility, meeting these obligations becomes difficult.

Pulse gives teams live charger-status visibility, network monitoring, and the operational records needed to respond faster.

Records, reports and billing must be accurate

Operators must keep accurate sales and operational records, provide technical and financial reports when required, issue accurate billing information, and retain transaction records.

They must also record and resolve customer complaints.

Pulse helps replace fragmented spreadsheets and manual updates with structured network, status, session, and operational data.

Transparent pricing is a compliance issue

Tariffs, fees, payment terms, and charging conditions must be clear, fair, transparent, and non-discriminatory.

Drivers need to understand what they are paying for. Operators need records to support every transaction.

Pulse helps make station information, pricing, availability, and charging data clearer for both drivers and operators.

Expansion without visibility is a risk

Expanding capacity, changing a site, relocating a station, or ceasing operations can trigger approval, reporting, or notice requirements.

Operating without the correct licence, expanding without approval, relocating without approval, or failing to give required notice can attract a RWF 1,000,000 fine—alongside possible suspension or revocation.

Pulse gives you one clear view of every site, charge point, status update, and operational event across your network.

Compliance is now a software problem, too

Pulse does not replace permits, licences, certified equipment, safety systems, or your legal responsibilities.

But it gives CPOs the digital infrastructure to operate with greater control:

The new regulations raise the standard for EV charging in Rwanda.

Pulse helps you meet it.

Explore Pulse for Business or contact business@pulsemap.app.

More about recent regulations.